The final .NET 8 and .NET 9 servicing releases arrived on 10 November 2026. Microsoft support ended the same day. A business can keep those applications running, but every service still using either runtime now needs an accountable decision: upgrade it, contain its exposure while a dependency is resolved, or retire it. The order should come from production evidence and business consequences, rather than the age of a repository.

Consider an account portal that accepts a payment, generates a receipt and posts a nightly reconciliation file. Its public website may be ready for .NET 10 while the receipt generator remains on .NET 8 in a separate container. The customer sees a working portal until the worker stops producing receipts. A sensible modernisation programme begins with that dependency, including who owns it and how its behaviour will be tested.

The support position on 16 November 2026

Microsoft's current support policy identifies .NET 8.0.34 and .NET 9.0.23, released on 10 November, as the final published patches for those versions. Neither runtime receives continuing security fixes or technical support. The supported alternatives are .NET 10.0.15, a long-term-support release, and .NET 11.0.0, a standard-term-support release. Microsoft's published end date for both supported major versions is 14 November 2028.

Those dates answer a lifecycle question, but they do not decide the destination for every application. .NET 10 is a reasonable default for a team that wants a mature LTS target and a measured adoption programme. .NET 11 can be considered where a required capability and the team's release cadence justify it. Check framework, hosting and third-party package support before choosing. A .NET Framework application may need a substantially different migration programme from an ASP.NET Core application retargeted to net10.0.

A final patch is still worth identifying

An application on .NET 8.0.34 is at the final published .NET 8 servicing level; it is still out of support. A system running 8.0.33 may additionally lack fixes shipped in the November patch. Record both facts. The former belongs in the unsupported-runtime exception; the latter belongs in the immediate vulnerability and patch assessment. Combining them into a single green or red field hides an important difference.

Inventory what is deployed, including the software nobody opens in a browser

Source repositories tell you what a team can build. They do not establish what is installed in production. The useful unit of inventory is a deployed executable, container or scheduled task, associated with the business process it serves. For each one, capture the running framework and patch version, deployment artefact or image digest, host, framework-dependent or self-contained packaging, outbound dependencies, owner and recovery route.

On a managed host, dotnet --list-runtimes can identify installed shared runtimes, but it cannot establish the version bundled into a self-contained executable. Inspect the publish output and deployment manifest for that. A container base-image tag is also insufficient once images have been rebuilt or cached; record the image digest and the actual running workload. Scheduled jobs, message consumers and one-off data utilities deserve the same inspection as the main website.

For the fictional account platform, a deployment register might contain five rows: website, payment API, document worker, reconciliation job and identity adapter. The first two have a tested .NET 10 build. The worker still uses .NET 8 because a document-generation package lacks an accepted replacement. The reconciliation job uses .NET 9 but has no externally exposed endpoint. This produces three different decisions, even though the programme has one deadline.

Rank by consequence and exposure, then test the assumptions

An internet-facing API processing personal or payment information deserves early attention, especially where access controls or compensating measures are weak. A disconnected internal batch job may have a different immediate exposure, but a failed reconciliation could still stop finance operations. Use a short, recorded assessment for each service: external reachability, data handled, privileged access, business interruption, replacement readiness and tested recovery.

Avoid turning those categories into an unexplained universal score. A weighted formula is useful only when the organisation agrees what each weight means. A more defensible first output is a small decision register showing the evidence, the unresolved dependency, the owner and the proposed release or exception date. Where evidence is missing, label it untested rather than assuming low exposure.

Choose the upgrade boundary before estimating cost

A .NET 10 upgrade might be a modest change to a stateless API, provided its dependencies, operating system and deployment pipeline are supported. A portal tied to older authentication middleware, a third-party reporting library and shared database migrations requires broader investigation. Treat the service boundary as the estimate boundary: what must change together for the application to remain usable?

Start with the target framework, SDK and CI runner. Then inspect NuGet package support, ASP.NET Core and Entity Framework Core changes, container images, identity providers, serialisation, database drivers, message formats and external API contracts. Retargeting a project file is an early experiment. The effort estimate should come from the compatibility findings and the tests needed to prove business behaviour, not from counting project files.

One .NET 10 change that can reach a customer

ASP.NET Core 10 changed cookie-authentication behaviour for recognised API endpoints. Unauthenticated or forbidden API requests now receive HTTP 401 or 403 instead of the previous login or access-denied redirect in applicable cases. Ordinary page endpoints retain redirect behaviour; XMLHttpRequests already had different handling. Microsoft identifies affected endpoints through metadata, including controllers marked [ApiController] and certain minimal APIs.

Suppose a legacy browser client expects a 302 redirect after a session expires. Following an upgrade, its API call may instead receive 401. The correct acceptance test expires the session deliberately, calls the protected endpoint, inspects the response and checks what the user sees next. The application team can update the client or deliberately configure a documented exception to the default behaviour. Leaving the outcome to an incidental manual login test is inadequate.

Worked acceptance case: one payment, one receipt, one ledger entry

Use a deliberately awkward transaction to test the account platform. The payment provider accepts a £240 charge, but the response is lost before the portal receives it. A retry follows while the document worker is processing a previous message. The intended outcome is one settled charge, one ledger entry and one receipt. These amounts and systems are illustrative test inputs, not Phases customer results.

Run the test with a stable idempotency identifier. Capture the original request, the simulated timeout, the retry, the provider's transaction record, the ledger posting and the receipt job result. A pass requires one settled payment, no duplicate ledger entry, one usable receipt and an audit trail linking the operations. Then run the same scenario with a rejected charge, an unavailable worker and a delayed queue message. Each failure needs its own expected recovery.

A test suite reporting 100 per cent pass rate is only meaningful when the scenarios and evidence are visible. Finance should confirm the ledger outcome, operations should confirm worker recovery, and engineering should provide the request and deployment traces. Record what was not exercised, such as month-end volume or a third-party outage, so the release approver can decide whether further testing is necessary.

The acceptance record can be short and exact

For the payment retry scenario, the record can say: condition, provider accepts the first request but the caller loses the response; expected, one charge and one ledger entry; observed, transaction identifiers and reconciliation extract; decision, finance owner signs after checking the extract. Another row covers expired-session behaviour, with expected HTTP status and client response. A third covers a worker restart with an existing queue backlog. This connects test evidence to the people accountable for the process.

Release in an order the organisation can recover from

Deploying a reporting endpoint first can test the new runtime, build pipeline and monitoring without changing the payment path. Next, deploy the API behind a controlled routing or feature-flag arrangement, where that is supported. Keep contracts compatible while older workers remain in use. Reserve shared schema changes and irreversible message transformations for a separately approved cutover.

Rollback deserves an operational rehearsal. A container can be redeployed in minutes, yet its previous version may be unable to read a message or database row written by the new release. Define the last safe rollback point, how outstanding queue messages are handled, who can pause processing and whether data restoration is actually possible. If the old and new versions cannot coexist, document a forward-repair procedure and the authority to invoke it.

After deployment, compare error rates, failed logins, payment mismatches, queue age, job completion and support contacts with the service's own baseline. Agree who can halt rollout and which observations trigger that decision. An organisation with ten transactions a day needs a different monitoring interpretation from one processing thousands per minute. Use measured operating patterns, not borrowed percentage thresholds.

What a temporary exception must contain

Some systems cannot move immediately. A document worker may depend on a library that has no tested .NET 10 release, or a partner integration may require a coordinated deployment window. The exception should name the deployed service and runtime, the business process affected, its external and privileged access, the compensating controls, the responsible owner and the date of the next review. It also needs a funded remediation route.

The decision is different for an exposed authentication service and an isolated reporting utility. For the former, containment might require restricted access, additional monitoring or taking a vulnerable interface out of service while an upgrade is prepared. For the latter, a shorter-term exception may be defensible if the owner has verified the operating conditions and recovery plan. These are examples of decisions to assess, not a universal security prescription.

A useful cost estimate separates engineering effort from operational exposure

An upgrade estimate should identify compatibility work, regression and integration testing, deployment rehearsals, third-party coordination and ongoing support. Add a separate view of business interruption: transactions affected per hour, the time required to restore processing and the cost of manual recovery. If a process handles 300 invoices per day and a failed worker requires two days to recover, the operational exposure is up to 600 delayed invoices before catch-up capacity is considered. That is a workload calculation, not a monetary saving or a prediction of failure.

The same calculation can help decide whether to invest in a rehearsal. If recovery requires replaying a queue and reconciling the resulting ledger entries, test the replay on representative data before release. Do not promise a cost reduction without actual processing volumes, labour rates, contract costs and a measured baseline.

How Phases can contribute

Phases' enterprise software services cover custom application development, integration and ongoing support. Its published Workways case study describes connected applications using .NET alongside other technologies; it should be read as evidence of platform and integration work, not as proof of this particular .NET 8-to-10 upgrade. For a mixed estate, the useful contribution is a joint assessment of running applications, dependencies and release evidence.

A scoped engagement can begin with deployment discovery and a compatibility assessment, followed by a prioritised backlog, upgrade implementation, contract and transaction tests, staged rollout, observability and handover. The exact scope depends on the estate. Business owners retain approval of financial and operational outcomes, while the delivery team supplies reproducible evidence and documented recovery procedures.

The decision to make this month

The deadline has already passed. Identify the deployed .NET 8 and .NET 9 services that still support important business operations. Record their final patch state and exposure, then agree which can move to .NET 10 or .NET 11 under a tested release and which need an exception with an owner and an expiry. The programme is successful when the production estate and its owners can demonstrate what changed, what remains and how service will be restored after an incident.

Discuss your application estate with Phases

If your team has several .NET 8 or .NET 9 services still running, contact Phases to discuss a scoped modernisation assessment. Bring the list of deployed services, hosting and container details, known package constraints, the integrations that cannot be interrupted and your next release window. The first conversation can establish which technical evidence is missing and what an achievable upgrade and support engagement would cover.

  • Did .NET 8 and .NET 9 applications stop on 10 November 2026?

    No. They can continue to run, but Microsoft ended security servicing and technical support for both versions on that date. An application owner must manage the unsupported-runtime exposure until the service is upgraded or retired.

  • Does installing .NET 8.0.34 or .NET 9.0.23 restore support?

    No. Those are the final published servicing releases, dated 10 November 2026. Applying the last patch and migrating to a supported major version are separate activities.

  • Should we choose .NET 10 or .NET 11?

    Both are supported through 14 November 2028 under Microsoft's current policy. .NET 10 is LTS and .NET 11 is STS. Assess package compatibility, hosting support, feature requirements and your team's release cadence before selecting a target for each application.

  • Will patching the host update a self-contained application?

    No. A self-contained executable carries its own runtime and must be rebuilt and republished with the intended servicing version. Containers also need a rebuilt image and redeployment. Verify the runtime actually executing in production.

  • What should the release approver ask for?

    A deployment inventory, affected business processes, compatibility findings, test cases with observed evidence, a rollback or forward-repair procedure, operational monitoring and a named owner for unresolved exceptions. Finance and operations should sign the outcomes relevant to their processes.